Home Standby Synchronized System

    Standby Synchronized System

    Standby Synchronized System

    Location/Site Client Date Duration
    Clients' Building, Brisbane {tag_client} 2006 4 Weeks

    Brisbane, Queensland

    Project/Overview
    To provide emergency standby and prime power generation for sites around Australia. All units are designed and supplied for site-specific projects and in full conformance to local authorities.

    Our Involvement
    Eneraque manufactured and supplied power generation equipment in compliance with client company's requirements, specification and Australian standards. Eneraque’s design team collaborated with the client to produce units capable of stable operation at many different sites.

    As soon as an operator sighted a major storm, the unit could be started and synchronised to the mains. This prevented any power disturbances during bad weather. An automatic start function, synchronised to the mains was also available in the event of an unplanned outage within the electrical network. Remote controls were provided at the new MSB and in the main control room via Si-tech opal units directly linked to the main Si-tech generator controller.

    Outcomes/Benefits
    The unit, once installed, was serviced and maintained by Eneraque, which ensured it’s availability to provide standby power at any given time.

    Downloads

Are you receiving our latest deals?

Subscribe to Eneraque mail to be the first to know about new products and exclusive offers.

We keep your information private. Read our Privacy Policy.